{"id":10529,"date":"2026-08-29T23:43:02","date_gmt":"2026-08-29T15:43:02","guid":{"rendered":"https:\/\/q8bbzjnpm5.wpdns.site\/?p=10529"},"modified":"2026-08-29T23:43:02","modified_gmt":"2026-08-29T15:43:02","slug":"future-trends-for-auxiliary-transformers-post-canton-fair","status":"publish","type":"post","link":"https:\/\/subian-electric.com\/it\/news\/future-trends-for-auxiliary-transformers-post-canton-fair\/","title":{"rendered":"Tendenze Future per Trasformatori Ausiliari Post-Fiera di Canton"},"content":{"rendered":"<p>Se passeggi per qualsiasi corridoio della Fiera di Canton, ti renderai conto che lo stile degli stand dei trasformatori non \u00e8 diverso da altri: i clienti non richiedono pi\u00f9 solo listini prezzi; ora cercano garanzie sulle perdite a vuoto, opzioni per il monitoraggio digitale e termini di consegna invece di mesi. Questo \u00e8 particolarmente vero per il settore dei trasformatori ausiliari, dove gli ordini e le richieste post-Fiera di Canton mostrano una tendenza molto chiara verso l'aumento dell'efficienza, dell'intelligenza, della compattezza e della consegna rapida.<\/p>\n<blockquote><p>In breve, lo sviluppo dei trasformatori ausiliari, secondo la domanda dopo la Fiera di Canton, pu\u00f2 essere descritto in cinque direzioni: (1) aumento dell'efficienza grazie a nuclei amorfi e ad alta qualit\u00e0 orientati al grano che consentono una riduzione delle perdite a vuoto del 30\u201350% rispetto alle strutture di generazione precedente; (2) la presenza di monitoraggio intelligente integrato: le differenze tra temperatura degli avvolgimenti, livello dell'olio e sistemi di sensori di gas stanno passando da caratteristiche opzionali a obbligatorie; (3) la tendenza verso design compatti, modulari e integrati su skid che riducono i tempi di installazione; (4) l'emergere di piattaforme di design standardizzate per tensioni tradizionali associate a 35\/0.4 kV e 10\/0.4 kV che rendono i tempi di consegna prevedibili; (5) la richiesta di documentazione in conformit\u00e0 agli standard IEC 60076 insieme a ispezioni di terze parti e dichiarazioni ambientali.<\/p><\/blockquote>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-10531\" src=\"https:\/\/subian-electric.com\/wp-content\/uploads\/2026\/08\/Future-Trends-For-Auxiliary-Transformers-Post-Canton-Fair.webp\" alt=\"Future Trends For Auxiliary Transformers Post Canton Fair\" width=\"1448\" height=\"1086\" \/><\/p>\n<hr \/>\n<h2 id=\"signal\">Cosa Segnala la Domanda Post-Fiera di Canton<\/h2>\n<p>La Fiera di Canton ha un prezioso e affidabile sistema di allerta precoce per la domanda globale di trasformatori poich\u00e9 \u00e8 il luogo in cui i principali produttori cinesi possono incontrare acquirenti di aziende di servizi pubblici, appaltatori EPC e utenti finali industriali in Medio Oriente, Africa, Sud-est asiatico, America Latina ed Europa. Durante le ultime tre fiere, gli stand dei trasformatori ausiliari hanno assistito a un cambiamento costante nei tipi di richieste fatte dagli acquirenti riguardo ai prodotti. Invece di chiedere il prezzo pi\u00f9 basso per un'unit\u00e0 da 50 kVA, gli acquirenti si sono spostati su nuove domande riguardo ai nuclei amorfi, ai sensori di temperatura wireless, alle opzioni di consegna in container e se il rapporto di prova ricevuto sar\u00e0 accettato dalla loro utility. Questo cambiamento non \u00e8 affatto una coincidenza: riflette le tendenze che si stanno verificando nelle attivit\u00e0 di approvvigionamento nei mercati domestici degli acquirenti.<\/p>\n<table>\n<thead>\n<tr>\n<th>Tendenza<\/th>\n<th>Fattore<\/th>\n<th>Segnale di mercato<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Perdite inferiori<\/td>\n<td>Costo energetico, regolamentazione<\/td>\n<td>Garanzie sulle perdite richieste nelle RFQ<\/td>\n<\/tr>\n<tr>\n<td>Monitoraggio intelligente<\/td>\n<td>Automazione, costo di interruzione<\/td>\n<td>Sensori che passano da opzione a standard<\/td>\n<\/tr>\n<tr>\n<td>Compatto\/modulare<\/td>\n<td>Costo di terra e civile<\/td>\n<td>Pacchetti skid e tipo scatola in crescita<\/td>\n<\/tr>\n<tr>\n<td>Piattaforme standard<\/td>\n<td>Pressione sui tempi di consegna<\/td>\n<td>Aspettative di consegna di 4\u201310 settimane<\/td>\n<\/tr>\n<tr>\n<td>Conformit\u00e0 documentale<\/td>\n<td>Regole di utility e doganali<\/td>\n<td>Routine di ispezione di terze parti<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"efficiency\">Tendenza 1: Efficienza e Riduzione delle Perdite<\/h2>\n<p>Dato che un trasformatore ausiliario funziona a livelli di carico elevati per tutto l'anno, le perdite sostenute diventano una spesa fissa costante e i regolatori insistono sulla riduzione di tali perdite. Pertanto, la risposta trovata dagli ingegneri \u00e8 stata l'implementazione di materiali di nucleo migliori. I nuclei in materiale amorfo (vetro metallico) sono in grado di ridurre le perdite operative di un significativo 30-50 percento rispetto all'acciaio silicio orientato a grano convenzionale e le classi GOES molto efficaci come la serie 23H e quelle pi\u00f9 recenti riescono a compensare il divario in modo economicamente ragionevole. Nel caso di un trasformatore ausiliario operante continuamente con una capacit\u00e0 di 500 kVA, ridurre le perdite a vuoto da 900 W a 600 W consente a un'azienda di risparmiare circa $260-$390 all'anno al prezzo di $0.10 \u2013 $0.15 per kWh, il che significa $6,500-$9,800 in 25 anni. Questo ha reso chiaro che gli acquirenti commerciali hanno incluso tali spese nelle loro valutazioni e i produttori hanno iniziato a menzionare solo le percentuali di perdita garantite secondo gli standard IEC 60076-1.<\/p>\n<h2 id=\"smart\">Tendenza 2: Monitoraggio Intelligente e Digitalizzazione<\/h2>\n<p>La seconda tendenza inconfondibile \u00e8 il monitoraggio digitale. Un trasformatore ausiliario era tipicamente considerato un bene passivo, esaminato solo durante le valutazioni annuali. Tuttavia, al giorno d'oggi, gli Indicatori di Temperatura degli Avvolgimenti (WTI), gli Indicatori di Temperatura dell'Olio (OTI), i manometri del livello dell'olio e i punti di campionamento dell'Analizzatore di Gas Disciolti (DGA) stanno diventando ora criteri di qualificazione per le parti transazionali, insieme all'opzione per trasmettitori wireless o connessi a SCADA. Un sensore di temperatura, che costa tra $200-$600 quando installato, \u00e8 in grado di segnalare problemi di tensione o raffreddamento settimane prima che questi portino a un guasto, e un semplice controllo sul sistema DGA ogni sei mesi consente di identificare problemi che potrebbero portare a un'interruzione forzata. Nelle sottostazioni automatizzate, il rapporto del trasformatore ausiliario si unisce ai rapporti del trasformatore principale a livello della sala di controllo \u2014 e i clienti di solito richiedono che tutte le attrezzature siano effettivamente pronte per l'interfaccia, anche se SCADA \u00e8 inclusa nel progetto in un secondo momento.<\/p>\n<table>\n<thead>\n<tr>\n<th>Caratteristica di monitoraggio<\/th>\n<th>Costo aggiuntivo tipico<\/th>\n<th>Cosa rileva<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Indicatore di temperatura degli avvolgimenti (WTI)<\/td>\n<td>$100\u2013$300<\/td>\n<td>Sovraccarico, guasto di raffreddamento<\/td>\n<\/tr>\n<tr>\n<td>Indicatore di temperatura dell'olio (OTI)<\/td>\n<td>$80\u2013$250<\/td>\n<td>Perdita di raffreddamento, stress ambientale<\/td>\n<\/tr>\n<tr>\n<td>Manometro del livello dell'olio con allarme<\/td>\n<td>$50\u2013$150<\/td>\n<td>Perdite, basso livello di olio<\/td>\n<\/tr>\n<tr>\n<td>Valvola di campionamento DGA<\/td>\n<td>$40\u2013$120<\/td>\n<td>Sviluppo di guasti all'isolamento<\/td>\n<\/tr>\n<tr>\n<td>Trasmettitore SCADA\/wireless<\/td>\n<td>$200\u2013$800<\/td>\n<td>Stato remoto, allarmi di tendenza<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"compact\">Tendenza 3: Design Compatti e Modulare<\/h2>\n<p>Terreni costosi nelle sottostazioni e opere civili impongono costi di progetto pi\u00f9 elevati. I partecipanti alla Fiera richiedono soluzioni a ingombro compatto e pacchetti modulari: trasformatore ausiliario fornito in un comune skid con l'apparecchiatura di bassa tensione, contatore e cubicolo di controllo che sono pre-cablati e pre-testati in fabbrica. Utilizzare un approccio di design prefabbricato riduce il tempo di installazione da settimane a giorni, aiuta a eliminare errori di cablaggio e sposta il collaudo al piano di fabbrica invece di eseguirlo in loco. Ad esempio, un'unit\u00e0 compatta con il pannello LV integrato pu\u00f2 aiutare a ridurre le dimensioni della sala elettrica della sottostazione del 20-30%. Si deve pagare un po' di pi\u00f9 per l'involucro e il lavoro di integrazione (5-15% premium).<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-10530\" src=\"https:\/\/subian-electric.com\/wp-content\/uploads\/2026\/08\/Trend-1-5.webp\" alt=\"Trend 1-5\" width=\"1448\" height=\"1086\" \/><\/p>\n<h2 id=\"platform\">Trend 4: Piattaforme Standardizzate per una Consegna Veloce<\/h2>\n<p>Negli ultimi anni, il feedback riguardante i tempi di consegna \u00e8 stato significativo nel mercato dei trasformatori, portando il segmento ausiliario a reagire con sforzi di standardizzazione. Questo significa che i produttori sono ora dotati di un insieme comune di standard, come: gradi di potenza comuni (100, 200, 315, 500, 800, 1.250 kVA); coppie di tensione comuni (35\/0,4 kV e 10\/0,4 kV); gruppo vettoriale predefinito Dyn11, tutti progettati una volta e fabbricati sulla linea di produzione. A causa di ci\u00f2, un dispositivo standard pu\u00f2 essere fornito entro 4\u201310 settimane, mentre una soluzione personalizzata richiederebbe 14\u201320 settimane. Il pubblico della Fiera ha appreso il segreto della consegna veloce: attenersi agli standard; utilizzare un grado standard superiore alle proprie esigenze energetiche, mantenere una coppia di tensione standard e mantenere la personalizzazione al minimo.<\/p>\n<table>\n<thead>\n<tr>\n<th>Piattaforma standard<\/th>\n<th>Tempo di consegna tipico<\/th>\n<th>Custom design lead time<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>100\u2013315 kVA, 10\/0.4 kV, Dyn11<\/td>\n<td>4\u20136 weeks<\/td>\n<td>12\u201316 weeks<\/td>\n<\/tr>\n<tr>\n<td>400\u2013800 kVA, 10\/0.4 kV, Dyn11<\/td>\n<td>5\u20138 weeks<\/td>\n<td>14\u201318 weeks<\/td>\n<\/tr>\n<tr>\n<td>1,000\u20131,600 kVA, 35\/0.4 kV, Dyn11<\/td>\n<td>6\u201310 weeks<\/td>\n<td>16\u201320 weeks<\/td>\n<\/tr>\n<tr>\n<td>2,500 kVA, 35\/0.4 kV, Dyn11<\/td>\n<td>8\u201310 weeks<\/td>\n<td>18\u201324 weeks<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"compliance\">Trend 5: Documentation, Inspection, and Compliance<\/h2>\n<p>The last trend refers to the principles of the procedure: clients regard documentation as a component of the product itself. The required test data covering IEC 60076, issue of certificates for type tests, and inspection carried out by the third-party authority (SGS, TUV, Bureau Veritas) including the local ones, as well as environmental declarations (RoHS, REACH and verification of materials for carbon footprint) are the expected standard stickers these days rather than just some optional feature. The buyers participating in the fair discarded suppliers who were not able to provide test proof. The new tendencies are generally beneficial for the buyers as they ensure that every manufacturer would be subjected to common and verifiable standards and ensure protection against dishonest low bidders. It also requires stating the scope of documentation in your specification.<\/p>\n<h2 id=\"impact\">What the Trends Mean for Your Budget<\/h2>\n<table>\n<thead>\n<tr>\n<th>Caratteristica<\/th>\n<th>Costo aggiuntivo tipico<\/th>\n<th>Vantaggio<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Nucleo amorfo<\/td>\n<td>+10\u201320% over conventional<\/td>\n<td>30\u201350% lower no-load loss<\/td>\n<\/tr>\n<tr>\n<td>High-grade GOES core<\/td>\n<td>+3\u20138%<\/td>\n<td>10\u201325% lower no-load loss<\/td>\n<\/tr>\n<tr>\n<td>Smart monitoring package<\/td>\n<td>+3\u20138%<\/td>\n<td>Early fault warning, SCADA ready<\/td>\n<\/tr>\n<tr>\n<td>Skid\/container integration<\/td>\n<td>+5\u201315%<\/td>\n<td>Days of installation time saved<\/td>\n<\/tr>\n<tr>\n<td>OLTC (on-load tap changer)<\/td>\n<td>+10\u201325%<\/td>\n<td>Stable LV bus on fluctuating grids<\/td>\n<\/tr>\n<tr>\n<td>Third-party inspection<\/td>\n<td>+1\u20133% or fixed fee<\/td>\n<td>Independent quality evidence<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>As a result, it turns out that a so-called \u201cfuture-proof\u201d auxiliary transformer is priced about 5-20% more than a conventional transformer, but the extra cost is compensated by lower power bill, smaller number of outages, and quicker commissioning of the site. The price of the transformer itself falls into the range of $2,000-35,000 for 50-2,500 kVA, depending on rating, brand, and additional features.<\/p>\n<h2 id=\"futureproof\">How to Future-Proof Your Specification<\/h2>\n<ul>\n<li>Provide information about losses in relation to the newest efficiency standards. Inquire about load and no-load loss guarantees in accordance with IEC 60076-1 and assess them from a capitalized view rather than checking a class list of products only.<\/li>\n<li>Add monitoring components, even if you postpone the installation of the interface. State that WTI\/OTI pointers and oil level gauges as well as the sampling valve for DGA need to be included since their costs are lower than during the equipment refurbishment.<\/li>\n<li>Opt for standardized platforms whenever it is feasible. Stick to the standard voltage and power capacity as well as the vector group so that delivery will be completed within 4-10 weeks and necessary spare parts will be available in the future.<\/li>\n<li>Request for full documents. You need to have a regular testing report, type testing paper when possible, third-party inspection option, and environmental certifications in your own language.<\/li>\n<li>Check whether the vendor can provide for modular integration. In small substations, consider the skid-mounted version that contains the low voltage switchgear and control cabinet and is factory-tested.<\/li>\n<li>Confirm the production capacity of the vendor. The factory that can produce both oil-immersed and dry units quickly will give you a safety net when plans change.<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-10532\" src=\"https:\/\/subian-electric.com\/wp-content\/uploads\/2026\/08\/How-to-Future-Proof-Your-Specification.webp\" alt=\"How to Future-Proof Your Specification\" width=\"1448\" height=\"1086\" \/><\/p>\n<h2 id=\"brands\">Top Brands and Price Ranges<\/h2>\n<table>\n<thead>\n<tr>\n<th>Marca<\/th>\n<th>Paese<\/th>\n<th>Future-trend strength<\/th>\n<th>Indicative price range (US$)<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>ABB<\/td>\n<td>Svizzera\/Svezia<\/td>\n<td>Digital monitoring ecosystems<\/td>\n<td>$4,000\u2013$60,000<\/td>\n<\/tr>\n<tr>\n<td>Siemens<\/td>\n<td>Germania<\/td>\n<td>Smart transformer integration<\/td>\n<td>$3,500\u2013$55,000<\/td>\n<\/tr>\n<tr>\n<td>Schneider Electric<\/td>\n<td>Francia<\/td>\n<td>Eco-design and dry-type range<\/td>\n<td>$2,500\u2013$40,000<\/td>\n<\/tr>\n<tr>\n<td>Hitachi Energy<\/td>\n<td>Svizzera<\/td>\n<td>Sensor and analytics packages<\/td>\n<td>$4,500\u2013$70,000<\/td>\n<\/tr>\n<tr>\n<td>Eaton<\/td>\n<td>USA<\/td>\n<td>Efficiency-focused distribution lines<\/td>\n<td>$2,000\u2013$35,000<\/td>\n<\/tr>\n<tr>\n<td>Jiangsu Subian Energia Elettrica<\/td>\n<td>Cina<\/td>\n<td>Standard platforms, fast delivery, smart options<\/td>\n<td>$2,000\u2013$35,000<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>In relation to auxiliary transformers appearing in the range of 50-2,500 kVA, prices depend on rating, options, and accessories. ABB, Siemens, Schneider Electric, Hitachi Energy, and Eaton are advanced in digital monitoring and the maturity of designs while their roadmaps can be taken as a good reference point as to how this product is going to develop. Jiangsu Subian Electric Power Co., Ltd has created the export offer around these trends for those wishing to use the proven engineering based on IEC 60076 norms at feasible timelines and prices. Importantly, the company has included low loss cores (amorphous types included), as well as standard platforms aimed at rapid delivery and optional smart monitoring methods together with skid-mounted solutions. Subian produces both oil submersible and dry auxiliary transformers, has proved its capabilities to conduct third-party inspections and its products have been used in the utility and EPC sectors in many countries. Factory prices and a lead time of 4-10 weeks allows the company to act quickly and get involved in development plans on the budget of 2026 years.See the current product range on the <a href=\"https:\/\/subian-electric.com\/it\/\">Subian Electric website<\/a>.<\/p>\n<h2 id=\"faq\">Domande frequenti<\/h2>\n<h3>What changed most for auxiliary transformers after recent Canton Fair sessions?<\/h3>\n<p>There has been a change in the approach taken by clients. They no longer care only about prices, but instead require information on no-load losses, technologies such as smart monitoring, platforms with guaranteed delivery times of four to ten weeks, and a comprehensive documentation package that conforms to IEC 60076 standards and is certified by a third party. Overall, efficiency and transparency of the delivery process are now considered the most important factors for concluding export contracts.<\/p>\n<h3>Is an amorphous core worth the extra cost on an auxiliary transformer?<\/h3>\n<p>In most cases, the answer is yes for a continuously loaded unit. The use of an amorphous core allows reducing no-load losses by 30-50% for an extra cost of 10-20%. For energy cost of $0.10-$0.15\/kWh, a 500 kVA unit saves approximately $6,500-$9,800 in energy consumption over the span of 25 years, which is considerably higher than the extra cost of buying the piece of equipment. If the load is used intermittently, the payback period increases and using higher-grade GOES can be beneficial.<\/p>\n<h3>Do I really need smart monitoring on a station service transformer?<\/h3>\n<p>Yes, for key stations. An oil-level indicator, a winding temperature sensor and a DGA sampling valve will cost hundreds of dollars and provide an advance warning of overload cooling problems or any insulation problems in the process of formation. When you compare it with the price of unplanned outage that disables your protection and controls, it becomes clear that it pays off as soon as the monitoring tool finds any problem for the first time.<\/p>\n<h3>Are dry-type auxiliary transformers becoming more popular?<\/h3>\n<p>Yes, especially with regard to underground, indoor and fire-sensitive installations. Cast resin dry-type units offer low maintenance requirements, fire safety, and lack of oil containment needs, and they are growing in export inquiries \u2014 as urban substations and more stringent fire regulations become available. Oil-immersed units continue to be the woodwork horses in the outdoors.<\/p>\n<h3>How does Subian keep delivery times short?<\/h3>\n<p>Subian uses standard design platform concepts in terms of common ratings and voltage pairs and vector groups. Thus, engineering and production times are minimal while utilizing a flexible production line that allows for custom designs and manufacturing. Standard designs can usually be shipped between 4 and 10 weeks with lead time specified in the manufacturing calendar during the quoting phase.<\/p>\n<h2 id=\"references\">Riferimenti<\/h2>\n<ul>\n<li><a href=\"https:\/\/webstore.iec.ch\/publication\/287\" rel=\"nofollow noopener\" target=\"_blank\">IEC 60076-1 \u2014 Power Transformers: General<\/a> \u2014 the standard that defines the guaranteed loss values now demanded by buyers.<\/li>\n<li><a href=\"https:\/\/webstore.iec.ch\/publication\/293\" rel=\"nofollow noopener\" target=\"_blank\">IEC 60076-5 \u2014 Ability to Withstand Short Circuit<\/a> \u2014 short-circuit verification required for auxiliary transformers in utility service.<\/li>\n<li><a href=\"https:\/\/www.iea.org\/reports\/energy-efficiency-2024\" rel=\"nofollow noopener\" target=\"_blank\">IEA Energy Efficiency Report<\/a> \u2014 policy context for the efficiency and loss-reduction push in distribution equipment.<\/li>\n<li><a href=\"https:\/\/www.hitachienergy.com\/products-and-solutions\/transformers\" rel=\"nofollow noopener\" target=\"_blank\">Hitachi Energy \u2014 Transformer Monitoring<\/a> \u2014 reference documentation for digital transformer monitoring systems.<\/li>\n<li><a href=\"https:\/\/www.nema.org\/standards\/view\/nema-tp-1-2022\" rel=\"nofollow noopener\" target=\"_blank\">NEMA TP-1 \u2014 Energy Efficiency for Distribution Transformers<\/a> \u2014 the efficiency benchmark used in loss evaluation in North America.<\/li>\n<li><a href=\"https:\/\/www.cantonfair.org.cn\/en\/\" rel=\"nofollow noopener\" target=\"_blank\">Canton Fair Official Site<\/a> \u2014 the sourcing event where these market trends are observable directly.<\/li>\n<\/ul>\n<h2 id=\"conclusion\">Conclusione<\/h2>\n<p>Trends of post-Canton Fair demand confirm that auxiliary transformers are changing from a commodity purchase to a product defined by specifications: low losses, monitoring incorporated, compact integration, standard solutions enabling prompt delivery, and complete verifiable documents. None of these trends is groundbreaking; they are widely available today, and the price of such a future-proof solution is insignificant in comparison to benefits of energy and outages savings. The best way to implement them is to include losses, monitoring, delivery expectations, and the scope of documentation requirements into own specifications and choose a vendor capable of producing both standard and custom solutions. Jiangsu Subian Electric Power is a manufacturer of IEC 60076-compliant auxiliary transformers featuring a low loss core, smart monitoring capabilities, and rapid standard lead times at factory pricing.Discuss your specification with the team through the <a href=\"https:\/\/subian-electric.com\/it\/\">official website<\/a> to see what these trends look like on your project\u2019s budget.<\/p>","protected":false},"excerpt":{"rendered":"<p>If you stroll through any corridor of the Canton Fair, you will realize that the style of transformer booths is no different from others: clients do not just require price lists anymore; they are now looking for guarantees of no-load losses, options for digital monitoring, and delivery terms instead of months. This is especially true [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":10531,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77],"tags":[],"class_list":["post-10529","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"blocksy_meta":[],"acf":[],"_links":{"self":[{"href":"https:\/\/subian-electric.com\/it\/wp-json\/wp\/v2\/posts\/10529","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/subian-electric.com\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/subian-electric.com\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/subian-electric.com\/it\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/subian-electric.com\/it\/wp-json\/wp\/v2\/comments?post=10529"}],"version-history":[{"count":3,"href":"https:\/\/subian-electric.com\/it\/wp-json\/wp\/v2\/posts\/10529\/revisions"}],"predecessor-version":[{"id":11090,"href":"https:\/\/subian-electric.com\/it\/wp-json\/wp\/v2\/posts\/10529\/revisions\/11090"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/subian-electric.com\/it\/wp-json\/wp\/v2\/media\/10531"}],"wp:attachment":[{"href":"https:\/\/subian-electric.com\/it\/wp-json\/wp\/v2\/media?parent=10529"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/subian-electric.com\/it\/wp-json\/wp\/v2\/categories?post=10529"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/subian-electric.com\/it\/wp-json\/wp\/v2\/tags?post=10529"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}