{"id":10529,"date":"2026-08-29T23:43:02","date_gmt":"2026-08-29T15:43:02","guid":{"rendered":"https:\/\/q8bbzjnpm5.wpdns.site\/?p=10529"},"modified":"2026-08-29T23:43:02","modified_gmt":"2026-08-29T15:43:02","slug":"future-trends-for-auxiliary-transformers-post-canton-fair","status":"publish","type":"post","link":"https:\/\/subian-electric.com\/ko\/news\/future-trends-for-auxiliary-transformers-post-canton-fair\/","title":{"rendered":"\uad11\uc800\uc6b0 \ubc15\ub78c\ud68c \uc774\ud6c4 \ubcf4\uc870 \ubcc0\uc555\uae30\uc5d0 \ub300\ud55c \ubbf8\ub798 \ub3d9\ud5a5"},"content":{"rendered":"<p>If you stroll through any corridor of the Canton Fair, you will realize that the style of transformer booths is no different from others: clients do not just require price lists anymore; they are now looking for guarantees of no-load losses, options for digital monitoring, and delivery terms instead of months. This is especially true about the auxiliary transformer sector, where the post-Canton Fair orders and inquiries show a very clear trend towards increasing efficiency, smartness, compactness, and fast delivery.<\/p>\n<blockquote><p>In short, the development of auxiliary transformers, according to demand following the Canton Fair, can be described in five directions: (1) increased efficiency thanks to amorphous and high grades of grain-oriented cores enabling no-load loss reduction of 30\u201350% in comparison with previous-generation structures; (2) the presence of built-in smart monitoring: differences between winding temperature, oil level, and gas sensor systems are turning from optional features to the compulsory ones; (3) the trend to compact, modular, and skid-integrated designs reducing installation time; (4) the emergence of standardized design platforms for traditional voltages associated with 35\/0.4 kV and 10\/0.4 kV making lead times predictable; (5) the requirement for documentation in accordance with IEC 60076 standards along with third-party inspections and environmental statements.<\/p><\/blockquote>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-10531\" src=\"https:\/\/subian-electric.com\/wp-content\/uploads\/2026\/08\/Future-Trends-For-Auxiliary-Transformers-Post-Canton-Fair.webp\" alt=\"Future Trends For Auxiliary Transformers Post Canton Fair\" width=\"1448\" height=\"1086\" \/><\/p>\n<hr \/>\n<h2 id=\"signal\">What Post-Canton Fair Demand Signals<\/h2>\n<p>The Canton Fair has a valuable and reliable early warning system for global transformer demand since it is where Premier Chinese manufacturers can meet buyers from utility companies, EPC contractors and industrial end users in the Middle East, Africa, Southeast Asia, Latin America and Europe. During last three shows, the auxiliary transformer booths have witnessed a steady change in types of queries being made by the buyers regarding the products. Instead of asking for the lowest price 50 kVA unit, the buyers moved on to new questions about the amorphous cores, wireless temperature sensors, container delivery options and whether the test report received will be accepted by their utility. This change is by no means a coincidence: it reflects the trends happening in procurement activities at the buyers\u2019 home markets.<\/p>\n<table>\n<thead>\n<tr>\n<th>Trend<\/th>\n<th>Driver<\/th>\n<th>Market signal<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Lower losses<\/td>\n<td>Energy cost, regulation<\/td>\n<td>Loss guarantees demanded in RFQs<\/td>\n<\/tr>\n<tr>\n<td>Smart monitoring<\/td>\n<td>Automation, outage cost<\/td>\n<td>Sensors moving from option to standard<\/td>\n<\/tr>\n<tr>\n<td>Compact\/modular<\/td>\n<td>Land and civil cost<\/td>\n<td>Skid and box-type packages growing<\/td>\n<\/tr>\n<tr>\n<td>Standard platforms<\/td>\n<td>Lead-time pressure<\/td>\n<td>4\u201310 week delivery expectations<\/td>\n<\/tr>\n<tr>\n<td>Documentation compliance<\/td>\n<td>Utility and customs rules<\/td>\n<td>Third-party inspection routine<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"efficiency\">Trend 1: Efficiency and Loss Reduction<\/h2>\n<p>Given that an auxiliary transformer functions at high load levels the entire year the losses incurred become a constant overhead expense and regulators are insisting on reducing those losses. Therefore, the answer engineers found is implementing better core materials. The amorphous material (metallic glass) cores are capable of decreasing the operating losses by a very significant 30-50 percent compared to conventional silicon grain-oriented steel and very effective GOES grades such as the series 23H and newer ones manage to compensate for the gap in an economically reasonable way. In the case of a continuously operated auxiliary transformer with a 500 kVA capacity, cutting the no-load losses from 900 W to 600 W allows a company to save around $260-$390 per year at the price of $0.10 &#8211; $0.15 per kWh meaning $6,500-$9,800 over 25 years. This made it clear that the trade buyers included those expenses into their evaluations and manufacturers started mentioning only guaranteed loss percentages according to IEC 60076-1 standards.<\/p>\n<h2 id=\"smart\">Trend 2: Smart Monitoring and Digitalization<\/h2>\n<p>The second unmistakable tendency is digital monitoring. An auxiliary transformer was typically considered a passive asset, only being examined during yearly assessments. During the present day, however, Winding Temperature Indicators (WTI), Oil Temperature Indicators (OTI), oil-level gauges, and Dissolved Gas Analyzer (DGA) sampling points are now becoming qualification criteria for transactional parties, along with the option for wireless or SCADA connected transmitters. A temperature sensor, which costs between $200-$600 when installed, is capable of alerting about voltage or cooling issues weeks earlier than those lead to failure, and a simple check on DGA system every half a year allows identifying issues that could ultimately lead to forced outage. In automated substations, the auxiliary transformer report joins reports from the main transformer at the control room level \u2014 and clients usually demand that all equipment is indeed ready for the interface, even if SCADA is included in the project later.<\/p>\n<table>\n<thead>\n<tr>\n<th>Monitoring feature<\/th>\n<th>Typical added cost<\/th>\n<th>\uac10\uc9c0\ud558\ub294 \ub0b4\uc6a9<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Winding temperature indicator (WTI)<\/td>\n<td>$100\u2013$300<\/td>\n<td>Overload, cooling fault<\/td>\n<\/tr>\n<tr>\n<td>Oil temperature indicator (OTI)<\/td>\n<td>$80\u2013$250<\/td>\n<td>Cooling loss, ambient stress<\/td>\n<\/tr>\n<tr>\n<td>Oil-level gauge with alarm<\/td>\n<td>$50\u2013$150<\/td>\n<td>Leaks, low oil<\/td>\n<\/tr>\n<tr>\n<td>DGA sampling valve<\/td>\n<td>$40\u2013$120<\/td>\n<td>Developing insulation faults<\/td>\n<\/tr>\n<tr>\n<td>SCADA\/wireless transmitter<\/td>\n<td>$200\u2013$800<\/td>\n<td>Remote status, trend alarms<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"compact\">Trend 3: Compact and Modular Designs<\/h2>\n<p>Costly land in substations and civil works impose higher project costs. The Fair participants are requesting compact footprint solutions and modular packages: auxiliary transformer supplied in a common skid with the low-voltage switchgear, meter, and control cubicle that are pre-wired and pre-tested in a factory. Using a prefabricated design approach reduces installation time from weeks to days, helps to eliminate wiring errors, and shifts the testing to the factory floor instead of performing it on-site. For instance, a compact unit with the LV panel integrated can help to minimize the substation electrical room size by 20-30%. One has to pay a little extra for the enclosure and the integration work (5-15% premium).<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-10530\" src=\"https:\/\/subian-electric.com\/wp-content\/uploads\/2026\/08\/Trend-1-5.webp\" alt=\"Trend 1-5\" width=\"1448\" height=\"1086\" \/><\/p>\n<h2 id=\"platform\">Trend 4: Standardized Platforms for Fast Delivery<\/h2>\n<p>In the last few years, the feedback surrounding lead time has been significant in the transformer market, leading the auxiliary segment to react with standardization efforts. This means that the manufacturers are now equipped with a common set of standards, such as: common power grades (100, 200, 315, 500, 800, 1,250 kVA); common voltage pairs (35\/0.4 kV and 10\/0.4 kV); default vector group Dyn11, all engineered once and fabricated on the manufacturing conveyor. Because of this, a standard device can be provided within 4\u201310 weeks, while a custom solution would require 14\u201320 weeks. The Fair audience learned the fast delivery secret: stay with the standards; use a standard grade above your energy requirements, keep to a standard voltage pair, and keep the customization to a minimum.<\/p>\n<table>\n<thead>\n<tr>\n<th>Standard platform<\/th>\n<th>Typical lead time<\/th>\n<th>Custom design lead time<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>100\u2013315 kVA, 10\/0.4 kV, Dyn11<\/td>\n<td>4\u20136 weeks<\/td>\n<td>12\u201316 weeks<\/td>\n<\/tr>\n<tr>\n<td>400\u2013800 kVA, 10\/0.4 kV, Dyn11<\/td>\n<td>5\u20138 weeks<\/td>\n<td>14\u201318 weeks<\/td>\n<\/tr>\n<tr>\n<td>1,000\u20131,600 kVA, 35\/0.4 kV, Dyn11<\/td>\n<td>6\u201310 weeks<\/td>\n<td>16\u201320 weeks<\/td>\n<\/tr>\n<tr>\n<td>2,500 kVA, 35\/0.4 kV, Dyn11<\/td>\n<td>8\u201310 weeks<\/td>\n<td>18\u201324 weeks<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"compliance\">Trend 5: Documentation, Inspection, and Compliance<\/h2>\n<p>The last trend refers to the principles of the procedure: clients regard documentation as a component of the product itself. The required test data covering IEC 60076, issue of certificates for type tests, and inspection carried out by the third-party authority (SGS, TUV, Bureau Veritas) including the local ones, as well as environmental declarations (RoHS, REACH and verification of materials for carbon footprint) are the expected standard stickers these days rather than just some optional feature. The buyers participating in the fair discarded suppliers who were not able to provide test proof. The new tendencies are generally beneficial for the buyers as they ensure that every manufacturer would be subjected to common and verifiable standards and ensure protection against dishonest low bidders. It also requires stating the scope of documentation in your specification.<\/p>\n<h2 id=\"impact\">What the Trends Mean for Your Budget<\/h2>\n<table>\n<thead>\n<tr>\n<th>\uae30\ub2a5<\/th>\n<th>Typical added cost<\/th>\n<th>Benefit<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\ube44\uc815\uc9c8 \ucf54\uc5b4<\/td>\n<td>+10\u201320% over conventional<\/td>\n<td>30\u201350% lower no-load loss<\/td>\n<\/tr>\n<tr>\n<td>High-grade GOES core<\/td>\n<td>+3\u20138%<\/td>\n<td>10\u201325% lower no-load loss<\/td>\n<\/tr>\n<tr>\n<td>Smart monitoring package<\/td>\n<td>+3\u20138%<\/td>\n<td>Early fault warning, SCADA ready<\/td>\n<\/tr>\n<tr>\n<td>Skid\/container integration<\/td>\n<td>+5\u201315%<\/td>\n<td>Days of installation time saved<\/td>\n<\/tr>\n<tr>\n<td>OLTC (on-load tap changer)<\/td>\n<td>+10\u201325%<\/td>\n<td>Stable LV bus on fluctuating grids<\/td>\n<\/tr>\n<tr>\n<td>\uc81c3\uc790 \uac80\uc0ac<\/td>\n<td>+1\u20133% \ub610\ub294 \uace0\uc815 \uc218\uc218\ub8cc<\/td>\n<td>Independent quality evidence<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>As a result, it turns out that a so-called \u201cfuture-proof\u201d auxiliary transformer is priced about 5-20% more than a conventional transformer, but the extra cost is compensated by lower power bill, smaller number of outages, and quicker commissioning of the site. The price of the transformer itself falls into the range of $2,000-35,000 for 50-2,500 kVA, depending on rating, brand, and additional features.<\/p>\n<h2 id=\"futureproof\">How to Future-Proof Your Specification<\/h2>\n<ul>\n<li>Provide information about losses in relation to the newest efficiency standards. Inquire about load and no-load loss guarantees in accordance with IEC 60076-1 and assess them from a capitalized view rather than checking a class list of products only.<\/li>\n<li>Add monitoring components, even if you postpone the installation of the interface. State that WTI\/OTI pointers and oil level gauges as well as the sampling valve for DGA need to be included since their costs are lower than during the equipment refurbishment.<\/li>\n<li>Opt for standardized platforms whenever it is feasible. Stick to the standard voltage and power capacity as well as the vector group so that delivery will be completed within 4-10 weeks and necessary spare parts will be available in the future.<\/li>\n<li>Request for full documents. You need to have a regular testing report, type testing paper when possible, third-party inspection option, and environmental certifications in your own language.<\/li>\n<li>Check whether the vendor can provide for modular integration. In small substations, consider the skid-mounted version that contains the low voltage switchgear and control cabinet and is factory-tested.<\/li>\n<li>Confirm the production capacity of the vendor. The factory that can produce both oil-immersed and dry units quickly will give you a safety net when plans change.<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-10532\" src=\"https:\/\/subian-electric.com\/wp-content\/uploads\/2026\/08\/How-to-Future-Proof-Your-Specification.webp\" alt=\"How to Future-Proof Your Specification\" width=\"1448\" height=\"1086\" \/><\/p>\n<h2 id=\"brands\">\uc8fc\uc694 \ube0c\ub79c\ub4dc \ubc0f \uac00\uaca9 \ubc94\uc704<\/h2>\n<table>\n<thead>\n<tr>\n<th>\ube0c\ub79c\ub4dc<\/th>\n<th>\uad6d\uac00<\/th>\n<th>Future-trend strength<\/th>\n<th>Indicative price range (US$)<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>ABB<\/td>\n<td>\uc2a4\uc704\uc2a4\/\uc2a4\uc6e8\ub374<\/td>\n<td>Digital monitoring ecosystems<\/td>\n<td>$4,000\u2013$60,000<\/td>\n<\/tr>\n<tr>\n<td>\uc9c0\uba58\uc2a4<\/td>\n<td>\ub3c5\uc77c<\/td>\n<td>Smart transformer integration<\/td>\n<td>$3,500\u2013$55,000<\/td>\n<\/tr>\n<tr>\n<td>\uc288\ub098\uc774\ub354 \uc77c\ub809\ud2b8\ub9ad<\/td>\n<td>\ud504\ub791\uc2a4<\/td>\n<td>Eco-design and dry-type range<\/td>\n<td>$2,500\u2013$40,000<\/td>\n<\/tr>\n<tr>\n<td>\ud788\ud0c0\uce58 \uc5d0\ub108\uc9c0<\/td>\n<td>\uc2a4\uc704\uc2a4<\/td>\n<td>Sensor and analytics packages<\/td>\n<td>$4,500\u2013$70,000<\/td>\n<\/tr>\n<tr>\n<td>\uc774\ud2bc<\/td>\n<td>\ubbf8\uad6d<\/td>\n<td>Efficiency-focused distribution lines<\/td>\n<td>$2,000\u2013$35,000<\/td>\n<\/tr>\n<tr>\n<td>\uc7a5\uc464 \uc218\ube44\uc548 \uc804\ub825<\/td>\n<td>\uc911\uad6d<\/td>\n<td>Standard platforms, fast delivery, smart options<\/td>\n<td>$2,000\u2013$35,000<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>In relation to auxiliary transformers appearing in the range of 50-2,500 kVA, prices depend on rating, options, and accessories. ABB, Siemens, Schneider Electric, Hitachi Energy, and Eaton are advanced in digital monitoring and the maturity of designs while their roadmaps can be taken as a good reference point as to how this product is going to develop. Jiangsu Subian Electric Power Co., Ltd has created the export offer around these trends for those wishing to use the proven engineering based on IEC 60076 norms at feasible timelines and prices. Importantly, the company has included low loss cores (amorphous types included), as well as standard platforms aimed at rapid delivery and optional smart monitoring methods together with skid-mounted solutions. Subian produces both oil submersible and dry auxiliary transformers, has proved its capabilities to conduct third-party inspections and its products have been used in the utility and EPC sectors in many countries. Factory prices and a lead time of 4-10 weeks allows the company to act quickly and get involved in development plans on the budget of 2026 years.See the current product range on the <a href=\"https:\/\/subian-electric.com\/ko\/\">Subian Electric website<\/a>.<\/p>\n<h2 id=\"faq\">\uc790\uc8fc \ubb3b\ub294 \uc9c8\ubb38<\/h2>\n<h3>What changed most for auxiliary transformers after recent Canton Fair sessions?<\/h3>\n<p>There has been a change in the approach taken by clients. They no longer care only about prices, but instead require information on no-load losses, technologies such as smart monitoring, platforms with guaranteed delivery times of four to ten weeks, and a comprehensive documentation package that conforms to IEC 60076 standards and is certified by a third party. Overall, efficiency and transparency of the delivery process are now considered the most important factors for concluding export contracts.<\/p>\n<h3>Is an amorphous core worth the extra cost on an auxiliary transformer?<\/h3>\n<p>In most cases, the answer is yes for a continuously loaded unit. The use of an amorphous core allows reducing no-load losses by 30-50% for an extra cost of 10-20%. For energy cost of $0.10-$0.15\/kWh, a 500 kVA unit saves approximately $6,500-$9,800 in energy consumption over the span of 25 years, which is considerably higher than the extra cost of buying the piece of equipment. If the load is used intermittently, the payback period increases and using higher-grade GOES can be beneficial.<\/p>\n<h3>Do I really need smart monitoring on a station service transformer?<\/h3>\n<p>Yes, for key stations. An oil-level indicator, a winding temperature sensor and a DGA sampling valve will cost hundreds of dollars and provide an advance warning of overload cooling problems or any insulation problems in the process of formation. When you compare it with the price of unplanned outage that disables your protection and controls, it becomes clear that it pays off as soon as the monitoring tool finds any problem for the first time.<\/p>\n<h3>Are dry-type auxiliary transformers becoming more popular?<\/h3>\n<p>Yes, especially with regard to underground, indoor and fire-sensitive installations. Cast resin dry-type units offer low maintenance requirements, fire safety, and lack of oil containment needs, and they are growing in export inquiries \u2014 as urban substations and more stringent fire regulations become available. Oil-immersed units continue to be the woodwork horses in the outdoors.<\/p>\n<h3>How does Subian keep delivery times short?<\/h3>\n<p>Subian uses standard design platform concepts in terms of common ratings and voltage pairs and vector groups. Thus, engineering and production times are minimal while utilizing a flexible production line that allows for custom designs and manufacturing. Standard designs can usually be shipped between 4 and 10 weeks with lead time specified in the manufacturing calendar during the quoting phase.<\/p>\n<h2 id=\"references\">\ucc38\uace0 \ubb38\ud5cc<\/h2>\n<ul>\n<li><a href=\"https:\/\/webstore.iec.ch\/publication\/287\" rel=\"nofollow noopener\" target=\"_blank\">IEC 60076-1 \u2014 Power Transformers: General<\/a> \u2014 the standard that defines the guaranteed loss values now demanded by buyers.<\/li>\n<li><a href=\"https:\/\/webstore.iec.ch\/publication\/293\" rel=\"nofollow noopener\" target=\"_blank\">IEC 60076-5 \u2014 Ability to Withstand Short Circuit<\/a> \u2014 short-circuit verification required for auxiliary transformers in utility service.<\/li>\n<li><a href=\"https:\/\/www.iea.org\/reports\/energy-efficiency-2024\" rel=\"nofollow noopener\" target=\"_blank\">IEA Energy Efficiency Report<\/a> \u2014 policy context for the efficiency and loss-reduction push in distribution equipment.<\/li>\n<li><a href=\"https:\/\/www.hitachienergy.com\/products-and-solutions\/transformers\" rel=\"nofollow noopener\" target=\"_blank\">Hitachi Energy \u2014 Transformer Monitoring<\/a> \u2014 reference documentation for digital transformer monitoring systems.<\/li>\n<li><a href=\"https:\/\/www.nema.org\/standards\/view\/nema-tp-1-2022\" rel=\"nofollow noopener\" target=\"_blank\">NEMA TP-1 \u2014 Energy Efficiency for Distribution Transformers<\/a> \u2014 the efficiency benchmark used in loss evaluation in North America.<\/li>\n<li><a href=\"https:\/\/www.cantonfair.org.cn\/en\/\" rel=\"nofollow noopener\" target=\"_blank\">Canton Fair Official Site<\/a> \u2014 the sourcing event where these market trends are observable directly.<\/li>\n<\/ul>\n<h2 id=\"conclusion\">\uacb0\ub860<\/h2>\n<p>Trends of post-Canton Fair demand confirm that auxiliary transformers are changing from a commodity purchase to a product defined by specifications: low losses, monitoring incorporated, compact integration, standard solutions enabling prompt delivery, and complete verifiable documents. None of these trends is groundbreaking; they are widely available today, and the price of such a future-proof solution is insignificant in comparison to benefits of energy and outages savings. The best way to implement them is to include losses, monitoring, delivery expectations, and the scope of documentation requirements into own specifications and choose a vendor capable of producing both standard and custom solutions. Jiangsu Subian Electric Power is a manufacturer of IEC 60076-compliant auxiliary transformers featuring a low loss core, smart monitoring capabilities, and rapid standard lead times at factory pricing.Discuss your specification with the team through the <a href=\"https:\/\/subian-electric.com\/ko\/\">official website<\/a> to see what these trends look like on your project\u2019s budget.<\/p>","protected":false},"excerpt":{"rendered":"<p>If you stroll through any corridor of the Canton Fair, you will realize that the style of transformer booths is no different from others: clients do not just require price lists anymore; they are now looking for guarantees of no-load losses, options for digital monitoring, and delivery terms instead of months. This is especially true [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":10531,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77],"tags":[],"class_list":["post-10529","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"blocksy_meta":[],"acf":[],"_links":{"self":[{"href":"https:\/\/subian-electric.com\/ko\/wp-json\/wp\/v2\/posts\/10529","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/subian-electric.com\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/subian-electric.com\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/subian-electric.com\/ko\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/subian-electric.com\/ko\/wp-json\/wp\/v2\/comments?post=10529"}],"version-history":[{"count":3,"href":"https:\/\/subian-electric.com\/ko\/wp-json\/wp\/v2\/posts\/10529\/revisions"}],"predecessor-version":[{"id":11090,"href":"https:\/\/subian-electric.com\/ko\/wp-json\/wp\/v2\/posts\/10529\/revisions\/11090"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/subian-electric.com\/ko\/wp-json\/wp\/v2\/media\/10531"}],"wp:attachment":[{"href":"https:\/\/subian-electric.com\/ko\/wp-json\/wp\/v2\/media?parent=10529"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/subian-electric.com\/ko\/wp-json\/wp\/v2\/categories?post=10529"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/subian-electric.com\/ko\/wp-json\/wp\/v2\/tags?post=10529"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}