{"id":236,"date":"2026-08-22T02:34:18","date_gmt":"2026-08-21T18:34:18","guid":{"rendered":"https:\/\/q8bbzjnpm5.wpdns.site\/?p=236"},"modified":"2026-08-29T23:43:35","modified_gmt":"2026-08-29T15:43:35","slug":"what-is-china-wholesale-power-pole-transformer","status":"publish","type":"post","link":"https:\/\/subian-electric.com\/ru\/news\/what-is-china-wholesale-power-pole-transformer\/","title":{"rendered":"What is China Wholesale Power Pole Transformer"},"content":{"rendered":"<p>A power plant buyer in Bangladesh has just acquired a government project for the purchase of 800 pole transformers to expand three-phase connection to market towns. The parameters are clear \u2014 the transformers must be of 100 kVA power, 11\/0.4 kV, Dyn11, copper winding \u2014 but the money provided for purchasing is not enough according to local dealers. After a few weeks of phone calls to manufacturers, the buyer comes across a term used often in Alibaba search results: <strong>China wholesale pole transformer<\/strong>. He wants to find out what this type of product stands for, how it corresponds to his project terms, and how to buy good equipment within the budget limit.<\/p>\n<p>The article provides importers and utility companies with detailed information about the Chinese wholesale pole transformer market, including information about the meaning of term, the standards behind this name, various configurations and ratings available on the market, realistic prices, and factory evaluation methods for ensuring that the implementation of the project does not turn into a dead loss.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-238\" src=\"https:\/\/subian-electric.com\/wp-content\/uploads\/2026\/08\/Inside-a-Power-Pole-Transformer.webp\" alt=\"\" width=\"1448\" height=\"1086\" \/><\/p>\n<h2 id=\"definition\">Defining the China Wholesale Power Pole Transformer<\/h2>\n<p>The term &#8220;<strong>China wholesale power pole transformer<\/strong>&#8221; denotes a conventional oil-insulated transformer that is placed on utility poles. It is supplied to the customers in bulk directly by Chinese manufacturers at wholesale price. The other key significance of the phrase is the term \u201cwholesale\u201d: the utility companies, rural electrification commission agents, EPC contractors, and distributors purchase this transformer in huge numbers (i.e., in containers), while homeowners do not.<\/p>\n<p>In terms of its working principle, it works like all the other transformers by reducing voltage supplied through electrical pole lines. The initial current provided from the primary feeder has a medium voltage, which varies within the range of 11 kV, 15 kV, 22 kV, and 33 kV in IEC markets, while it equals 7.2 kV and 14.4 kV in North American markets. The transformer gets its name from the fact that it is attached to the utility pole across the arm that supports high voltage conductors that are connected to fuse cut-outs and lightening arrestors on one side and low voltage power wires that serve customers on another.<\/p>\n<p>The technology used in manufacturing this transformer is standard worldwide, which allows for buying these transformers wholesale. There are no exclusive features offered in that transformer. In fact, the excellence of the transformer produced depends on its efficiency, losses, and quality of manufacturing processes.<\/p>\n<h2 id=\"construction\">Construction: What Is Inside the Tank<\/h2>\n<p>Understanding the anatomy of a pole transformer helps you read a quotation and catch spec errors before they become expensive. The main components are:<\/p>\n<table>\n<thead>\n<tr>\n<th>\u041a\u043e\u043c\u043f\u043e\u043d\u0435\u043d\u0442<\/th>\n<th>Material \/ design<\/th>\n<th>\u041f\u043e\u0447\u0435\u043c\u0443 \u044d\u0442\u043e \u0432\u0430\u0436\u043d\u043e<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u0421\u0435\u0440\u0434\u0435\u0447\u043d\u0438\u043a<\/td>\n<td>Grain-oriented silicon steel (CRGO) laminations, or amorphous metal<\/td>\n<td>Determines no-load (iron) losses<\/td>\n<\/tr>\n<tr>\n<td>\u041f\u0435\u0440\u0432\u0438\u0447\u043d\u0430\u044f \u043e\u0431\u043c\u043e\u0442\u043a\u0430<\/td>\n<td>Copper or aluminum, layer or disc wound<\/td>\n<td>Determines load losses and short-circuit strength<\/td>\n<\/tr>\n<tr>\n<td>\u0412\u0442\u043e\u0440\u0438\u0447\u043d\u0430\u044f \u043e\u0431\u043c\u043e\u0442\u043a\u0430<\/td>\n<td>Copper or aluminum<\/td>\n<td>Same \u2014 copper preferred for durability<\/td>\n<\/tr>\n<tr>\n<td>\u0418\u0437\u043e\u043b\u044f\u0446\u0438\u044f<\/td>\n<td>Kraft paper + mineral oil (IEC 60296)<\/td>\n<td>Dielectric strength, life expectancy<\/td>\n<\/tr>\n<tr>\n<td>Tank<\/td>\n<td>Welded steel, corrosion-protected<\/td>\n<td>Weathertightness, oil volume, heat radiation<\/td>\n<\/tr>\n<tr>\n<td>\u0412\u0432\u043e\u0434\u044b<\/td>\n<td>Porcelain or polymer, HV and LV<\/td>\n<td>External insulation, creepage distance<\/td>\n<\/tr>\n<tr>\n<td>\u041f\u0435\u0440\u0435\u043a\u043b\u044e\u0447\u0430\u0442\u0435\u043b\u044c \u043e\u0442\u0432\u043e\u0434\u043e\u0432<\/td>\n<td>Off-circuit, \u00b12\u00d72.5% or \u00b15%<\/td>\n<td>Voltage matching to site conditions<\/td>\n<\/tr>\n<tr>\n<td>\u0410\u043a\u0441\u0435\u0441\u0441\u0443\u0430\u0440\u044b<\/td>\n<td>Oil conservator or sealed, breather, drain valve, nameplate<\/td>\n<td>Maintenance and identification<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Two choices in electric machine specification play a primary role in determining cost and performance. The first choice involves the use of copper vs aluminum windings. Copper improves the performance of load losses and short-circuit withstand but typically increases material cost by approximately 10-15%. The second choice is that of conventional CRGO core vs amorphous core. The use of amorphous metal allows for the decrease of no-load losses by approximately 70-80%, which is attractive when efficiency is important, but will increase the first cost by approximately 15-25%.<\/p>\n<h2 id=\"ratings\">Standard Ratings and Voltage Classes<\/h2>\n<p><strong>Chinese manufacturing<\/strong> units have a well-known range of ratings, and the positive news for those who import is that this range fits in well with international regulation. The most common sizes of orders, along with most typical applications, are presented below.<\/p>\n<table>\n<thead>\n<tr>\n<th>\u0420\u0435\u0439\u0442\u0438\u043d\u0433<\/th>\n<th>Phase<\/th>\n<th>Voltage ratio examples<\/th>\n<th>\u0422\u0438\u043f\u0438\u0447\u043d\u0430\u044f \u043e\u0431\u0441\u043b\u0443\u0436\u0438\u0432\u0430\u0435\u043c\u0430\u044f \u043d\u0430\u0433\u0440\u0443\u0437\u043a\u0430<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>5\u201315 kVA<\/td>\n<td>1<\/td>\n<td>7.2\/0.24 kV, 14.4\/0.24 kV<\/td>\n<td>1\u20135 single homes or small farms<\/td>\n<\/tr>\n<tr>\n<td>25\u201350 kVA<\/td>\n<td>1 or 3<\/td>\n<td>11\/0.4 kV, 22\/0.4 kV<\/td>\n<td>12\u201350 households<\/td>\n<\/tr>\n<tr>\n<td>75\u2013100 kVA<\/td>\n<td>1 or 3<\/td>\n<td>11\/0.4 kV, 33\/0.4 kV<\/td>\n<td>60\u2013120 households or a small shop cluster<\/td>\n<\/tr>\n<tr>\n<td>150\u2013250 kVA<\/td>\n<td>3<\/td>\n<td>11\/0.4 kV, 33\/0.4 kV<\/td>\n<td>Market town center, small industry<\/td>\n<\/tr>\n<tr>\n<td>315\u2013500 kVA<\/td>\n<td>3<\/td>\n<td>11\/0.4 kV, 22\/0.4 kV<\/td>\n<td>Larger commercial zones, boreholes, mills<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Voltage classes are supposed to be compatible with the corresponding system. The transformer is meant to operate at 11 kV but it is inappropriate to use the same transformer for energizing a 33kV line. This is the reason why we need to pay attention to the primary voltage, range of taps, and vector group at the first stages of investigation.<\/p>\n<h2 id=\"config\">Single-Phase vs Three-Phase Configurations<\/h2>\n<p>Your distribution system, rather than your choice, determines phase configuration. While Africa, Asia, the Middle East, and most of Europe operate with three-phase medium-voltage distribution lines and three-phase transformers that provide 400\/230 V, North America and part of Latin America utilize the single-phase medium-voltage distribution system and 120\/240 V split-phase transformers.<\/p>\n<table>\n<thead>\n<tr>\n<th>\u0410\u0441\u043f\u0435\u043a\u0442<\/th>\n<th>\u041e\u0434\u043d\u043e\u0444\u0430\u0437\u043d\u044b\u0439 \u0441\u0442\u043e\u043b\u0431\u043e\u0432\u044b\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440<\/th>\n<th>\u0422\u0440\u0435\u0445\u0444\u0430\u0437\u043d\u044b\u0439 \u0441\u0442\u043e\u043b\u0431\u043e\u0432\u044b\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Typical ratings<\/td>\n<td>5\u2013167 \u043a\u0412\u0410<\/td>\n<td>15\u2013500 kVA<\/td>\n<\/tr>\n<tr>\n<td>LV output<\/td>\n<td>120\/240 V split or 240 V<\/td>\n<td>400\/230 V<\/td>\n<\/tr>\n<tr>\n<td>Weight (100 kVA)<\/td>\n<td>\u2248 380\u2013450 kg<\/td>\n<td>\u2248 700\u2013900 kg<\/td>\n<\/tr>\n<tr>\n<td>Price (100 kVA, FOB China)<\/td>\n<td>$800\u2013$1,500<\/td>\n<td>$1,400\u2013$2,400<\/td>\n<\/tr>\n<tr>\n<td>\u041b\u0443\u0447\u0448\u0435 \u0432\u0441\u0435\u0433\u043e \u0434\u043b\u044f<\/td>\n<td>Low-density rural, US-style grids<\/td>\n<td>Three-phase rural\/urban LV networks<\/td>\n<\/tr>\n<tr>\n<td>Failure impact<\/td>\n<td>Affects one phase \/ fewer customers<\/td>\n<td>Affects all three phases<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Three-phase systems are heavier and need a better pole and crossarm compared to single-phase systems which are lighter and easier to deal with. If an emergency happens, it is possible to temporarily feed three-phase systems using one phase, but that must be implemented in the design and cannot be improvised in practice.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-239\" src=\"https:\/\/subian-electric.com\/wp-content\/uploads\/2026\/08\/Single-Phase-vs-Three-Phase-Pole-Transformers.webp\" alt=\"\" width=\"1448\" height=\"1086\" \/><\/p>\n<h2 id=\"standards\">Standards, Nameplate, and Test Reports<\/h2>\n<p>The single most important document in a wholesale transaction is the nameplate, because every number on it is a contractual commitment. A compliant nameplate for a three-phase unit typically reads:<\/p>\n<ul>\n<li>Rated power: 100 kVA, ONAN<\/li>\n<li>Voltage ratio: 11,000 \u00b1 2\u00d72.5% \/ 400\u2013433 V<\/li>\n<li>Vector group: Dyn11<\/li>\n<li>Short-circuit impedance: 4.0\u20134.5% (IEC 60076-5)<\/li>\n<li>No-load loss: \u2264 210 W; Load loss at 75\u00b0C: \u2264 1,600 W<\/li>\n<li>Impulse withstand: 75 kVp (IEC 60076-3)<\/li>\n<li>Winding temperature rise: \u2264 65 K average (IEC 60076-2)<\/li>\n<li>Standard: IEC 60076 series; year of manufacture; serial number<\/li>\n<\/ul>\n<p>The applicable regulatory standards for shipments to the USA are IEEE C57.12.00, C57.12.20 and, wherever applicable, NEMA TP-1 efficiency depending on the states involved. The purchase contract must indicate the losses, which should not exceed nameplate values, providing also for liquidated damages. Routine test certificates are supplied with every shipment and specific reports (for impulse and temperature rise tests) are issued from a certified laboratory once per design.<\/p>\n<h2 id=\"price\">Wholesale Price Structure and Tiers<\/h2>\n<p>As soon as you know how factories come up with quotations, prices are clear. Driver costs include things like oil, labor, copper, and CRGO steel \u2014 metal costs fluctuate the prices every day, so you must indicate the quote validity duration. Typical wholesale prices of Chinese factories:<\/p>\n<table>\n<thead>\n<tr>\n<th>Rating and type<\/th>\n<th>FOB price (China)<\/th>\n<th>Container capacity<\/th>\n<th>Typical production time<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>15 kVA single-phase<\/td>\n<td>$350\u2013$600<\/td>\n<td>\u2248 100\u2013120 pcs \/ 40-ft<\/td>\n<td>30\u201345 days<\/td>\n<\/tr>\n<tr>\n<td>50 kVA single-phase<\/td>\n<td>$650\u2013$1,000<\/td>\n<td>\u2248 70\u201390 pcs \/ 40-ft<\/td>\n<td>30\u201350 days<\/td>\n<\/tr>\n<tr>\n<td>100 kVA single-phase<\/td>\n<td>$800\u2013$1,500<\/td>\n<td>\u2248 40\u201360 pcs \/ 40-ft<\/td>\n<td>35\u201355 days<\/td>\n<\/tr>\n<tr>\n<td>50 kVA three-phase<\/td>\n<td>$1,500\u2013$2,600<\/td>\n<td>\u2248 40\u201360 pcs \/ 40-ft<\/td>\n<td>35\u201360 days<\/td>\n<\/tr>\n<tr>\n<td>100 kVA three-phase<\/td>\n<td>$1,400\u2013$2,400<\/td>\n<td>\u2248 20\u201340 pcs \/ 40-ft<\/td>\n<td>40\u201360 days<\/td>\n<\/tr>\n<tr>\n<td>250 kVA three-phase<\/td>\n<td>$3,200\u2013$5,500<\/td>\n<td>\u2248 10\u201320 pcs \/ 40-ft<\/td>\n<td>45\u201370 days<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Two cautionary notes concern price comparisons. Firstly, it is critical to ensure that the items compared are the same: i.e. copper versus aluminum windings, CRGO versus amorphous core, accessories delivered, and testing scope should be compared. Secondly, landed cost \u2013 freight, insurance, import duty, inspection, port handling \u2013 usually accounts for extra 25-45% on top of the FOB price; therefore, for instance, the unit that costs $2,000 will arrive at about $2,600 \u2013 $2,900. Thus, a unit with a low FOB price might not be the cheapest overall.<\/p>\n<h2 id=\"quality\">How to Buy Safely: Factory Screening<\/h2>\n<p>When it comes to wholesale importing of concentrates, you may end up with a bad batch, which negates your entire shipment, leading to failure in your electrification program. Consequently, you should shortlist suppliers based on the following checklist:<\/p>\n<p>Legal and export records: Your suppliers must provide proof of their business license, export history as well as their references.<\/p>\n<p>Type test reports: This includes certified type test reports IEC 60076 covering impulse, temperature rise as well as short-circuit withstand tests.<\/p>\n<p>Factory audit: Request for a video tour or a third-party audit covering the winding process, tank fabrication process, oil handling as well as the heat-run test.<\/p>\n<p>Loss verification: Ensure that you include contractual agreements stating the amount of losses as well as penalties in case of any discrepancies. If possible, you could also include witness tests in the agreement.<\/p>\n<p>Pre-shipment inspection: Inspect your supplier&#8217;s samples through one of the international organizations such as SGS, BV or T\u00fcV and ensure that the losses, ratio as well as oil quality are in check.<\/p>\n<p>Payment terms: Export business usually involves making payments whereby 30% is paid in advance and the remaining 70% upon receiving the shipping documents. Avoid making 100% prepayment, especially to new suppliers.<\/p>\n<p>Reputable Chinese suppliers would not mind any scrutiny, since they are not affected by the fly-by-night workshops that may offer fraudulent supply of equipment at cheaper prices.<\/p>\n<h2 id=\"brands\">Top Brands and Pricing Comparison<\/h2>\n<p>It is interesting to compare the market of pole transformers in the international sector with that in China. The prices provided in this section should be referenced for a 100 kVA three-phase unit according to the FOB pricing system. Prices will differ according to different configuration and copper prices.<\/p>\n<table>\n<thead>\n<tr>\n<th>Brand \/ source<\/th>\n<th>\u0421\u0442\u0440\u0430\u043d\u0430<\/th>\n<th>100 kVA price range<\/th>\n<th>\u041f\u043e\u0437\u0438\u0446\u0438\u043e\u043d\u0438\u0440\u043e\u0432\u0430\u043d\u0438\u0435<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>ABB<\/td>\n<td>\u0428\u0432\u0435\u0439\u0446\u0430\u0440\u0438\u044f<\/td>\n<td>$4,200\u2013$6,500<\/td>\n<td>Premium global brand, wide service network<\/td>\n<\/tr>\n<tr>\n<td>\u0421\u0438\u043c\u0435\u043d\u0441<\/td>\n<td>\u0413\u0435\u0440\u043c\u0430\u043d\u0438\u044f<\/td>\n<td>$4,000\u2013$6,800<\/td>\n<td>Strong in Europe, Middle East, Asia<\/td>\n<\/tr>\n<tr>\n<td>Schneider Electric<\/td>\n<td>\u0424\u0440\u0430\u043d\u0446\u0438\u044f<\/td>\n<td>$3,800\u2013$6,200<\/td>\n<td>Integrated LV\/MV ecosystem<\/td>\n<\/tr>\n<tr>\n<td>Hitachi Energy<\/td>\n<td>\u0428\u0432\u0435\u0439\u0446\u0430\u0440\u0438\u044f\/\u042f\u043f\u043e\u043d\u0438\u044f<\/td>\n<td>$4,500\u2013$7,000<\/td>\n<td>Utility-grade reliability reputation<\/td>\n<\/tr>\n<tr>\n<td>\u0418\u0442\u043e\u043d<\/td>\n<td>Ireland\/USA<\/td>\n<td>$3,500\u2013$5,800<\/td>\n<td>Common in Americas for distribution units<\/td>\n<\/tr>\n<tr>\n<td>TBEA \/ China XD Electric<\/td>\n<td>\u041a\u0438\u0442\u0430\u0439<\/td>\n<td>$1,600\u2013$2,800<\/td>\n<td>Large state-backed manufacturers<\/td>\n<\/tr>\n<tr>\n<td>Jiangsu Subian Electric Power<\/td>\n<td>\u041a\u0438\u0442\u0430\u0439<\/td>\n<td>$1,400\u2013$2,400<\/td>\n<td>Export-focused, IEC-tested, flexible MOQs<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Leading international companies like ABB, Siemens, Schneider Electric, and Hitachi Energy have brought their years of experience from their operations around the globe, as well as their engineers in each of the countries and their certification history to utility projects supported by donor funds. Although they charge a premium that is two to three times higher than local makers, they justify the price with their associated services.<\/p>\n<p>Meanwhile,<strong> Jiangsu Subian Electric Power<\/strong> has a ways to offer the same type of transformers with all the essential IEC 60076 tests but at much more competitive prices. Apex has produced and sold transformers varying from 5 kVA to 2,500 kVA being capable of implementing custom requirements and assisting customers with electrical tests, packing, and logistics of new equipment for small scale energy projects in Asia, Africa or Latin America.<\/p>\n<h2 id=\"programs\">Using Pole Transformers in Electrification Programs<\/h2>\n<p>Wholesale pole transformers are the workhorse of rural electrification programs, and program planners usually standardize on two or three ratings to simplify spares and training. A common pattern is:<\/p>\n<ul>\n<li><strong>25 \u043a\u0412\u0410<\/strong> for villages up to 20 households;<\/li>\n<li><strong>50\u2013100 kVA<\/strong> for larger villages and small commercial centers;<\/li>\n<li><strong>200\u2013315 kVA<\/strong> for district headquarters and industrial clusters.<\/li>\n<\/ul>\n<p>Donor-funded initiatives such as those by international bodies like World Bank and AfDB necessitate compliance with IEC 60076 standards, third-party inspection and a spare-parts package of about 3-5percent of units. The planners define the protection complement, which includes fuse cutouts, surges arresters and grounding, which is usually shipped separately from the transformer. As a thumb rule for budgeting, Plan to 1.3-1.6 times the FOB price of the transformer installed for each unit inclusive of protection, accessories, labour for installation and launches.<\/p>\n<h2 id=\"faq\">\u0427\u0430\u0441\u0442\u043e \u0437\u0430\u0434\u0430\u0432\u0430\u0435\u043c\u044b\u0435 \u0432\u043e\u043f\u0440\u043e\u0441\u044b<\/h2>\n<h3>What is the typical price of a China wholesale power pole transformer?<\/h3>\n<p>Single-phase units (10\u2013167 kVA) run <strong>$350\u2013$1,500 FOB China<\/strong>; three-phase units (15\u2013500 kVA) run <strong>$1,500\u2013$12,000<\/strong>. A benchmark 100 kVA three-phase Dyn11 unit costs $1,400\u2013$2,400 FOB. Landed cost adds 25\u201345% for freight, duties, insurance, and inspection. Prices move with copper and CRGO steel prices, so request quotes with 15\u201330 day validity.<\/p>\n<h3>What standards should a China-made pole transformer meet?<\/h3>\n<p>IEC 60076 series is the universal reference: part 1 ratings, part 2 temperature rise, part 3 insulation and impulse, part 5 short-circuit. For the Americas, use IEEE C57.12.00\/C57.12.20 and NEMA TP-1 efficiency. Insist on routine test certificates per unit and certified type test reports per design.<\/p>\n<h3>How many pole transformers fit in a container?<\/h3>\n<p>A 40-ft container holds roughly 100\u2013120 small single-phase units, 40\u201360 mid-size units, or 10\u201340 three-phase units depending on rating and tank dimensions. Loose loading is typical for transformers this size, with proper blocking to prevent tank damage; palletizing and export crating are available at extra cost.<\/p>\n<h3>Are copper and aluminum winding units interchangeable?<\/h3>\n<p>The following statement applies: Copper windings offer reduced resistance losses (during operations) and improved ability to withstand short circuits, while aluminum is cheaper but somewhat larger and less durable during multiple fault events. Loss values, nameplate, and short circuit test results must apply to the specified winding. The term &#8220;aluminum equivalent&#8221; may lead to some misunderstandings and problems.<\/p>\n<h3>How do I protect the transformer at the pole top?<\/h3>\n<p>Normal safety features include fuse cutout on the primary, a surge arrester (ZnO type) on the primary, and grounding of both tank and low voltage neutral. In lightning prone areas use an additional arrester or keep grounding resistance less than 10 ohms. In integrated CSP transformers the fuse, arrester and secondary breaker functions are integrated with the structure of the tank and provide less maintenance and greater ease of use in changing the components.<\/p>\n<h2 id=\"references\">\u0421\u0441\u044b\u043b\u043a\u0438<\/h2>\n<ul>\n<li><a href=\"https:\/\/www.iec.ch\/\" rel=\"nofollow noopener\" target=\"_blank\">IEC<\/a> \u2014 Publisher of the IEC 60076 transformer standard series referenced throughout.<\/li>\n<li><a href=\"https:\/\/www.ieee.org\/\" rel=\"nofollow noopener\" target=\"_blank\">IEEE<\/a> \u2014 Source of IEEE C57.12.00 \/ C57.12.20 for North American pole transformers.<\/li>\n<li><a href=\"https:\/\/www.nema.org\/\" rel=\"nofollow noopener\" target=\"_blank\">NEMA<\/a> \u2014 TP-1 efficiency standard for distribution transformers.<\/li>\n<li><a href=\"https:\/\/www.worldbank.org\/\" rel=\"nofollow noopener\" target=\"_blank\">World Bank<\/a> \u2014 Rural electrification procurement frameworks and technical standards.<\/li>\n<li><a href=\"https:\/\/www.sgs.com\/\" rel=\"nofollow noopener\" target=\"_blank\">SGS<\/a> \u2014 Pre-shipment inspection and factory audit services for imported electrical equipment.<\/li>\n<li><a href=\"https:\/\/www.energy.gov\/\" rel=\"nofollow noopener\" target=\"_blank\">U.S. Department of Energy<\/a> \u2014 Distribution transformer efficiency regulations and test data.<\/li>\n<li><a href=\"https:\/\/subian-electric.com\/ru\/\">Jiangsu Subian Electric Power<\/a> \u2014 Chinese manufacturer of distribution and pole-mounted transformers.<\/li>\n<\/ul>\n<h2 id=\"conclusion\">\u0417\u0430\u043a\u043b\u044e\u0447\u0435\u043d\u0438\u0435<\/h2>\n<p>A China wholesale power pole transformer is defined as a standardized oil-immersed transformer that is mass-produced in factories in China and can be bought at around 40% to 60% lower price than similar ones in the West. Its cost might be justified but only if the specification is adhered to, the manufacturer is verified, and losses are assured.<\/p>\n<p>This means that you should specify the voltage class, vector group, tap range, and the phase configuration before making a comparison of quotations.<\/p>\n<p>You should also understand the price range of $350-$1,500 for single-phase and $1,500-12,000 for three-phase transformers and add around 25-45% for freight and handling charges.<\/p>\n<p>It is essential to require IEC 60076 routine certification for every piece of equipment purchased.<\/p>","protected":false},"excerpt":{"rendered":"<p>A power plant buyer in Bangladesh has just acquired a government project for the purchase of 800 pole transformers to expand three-phase connection to market towns. The parameters are clear \u2014 the transformers must be of 100 kVA power, 11\/0.4 kV, Dyn11, copper winding \u2014 but the money provided for purchasing is not enough according [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":237,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77],"tags":[],"class_list":["post-236","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"blocksy_meta":[],"acf":[],"_links":{"self":[{"href":"https:\/\/subian-electric.com\/ru\/wp-json\/wp\/v2\/posts\/236","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/subian-electric.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/subian-electric.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/subian-electric.com\/ru\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/subian-electric.com\/ru\/wp-json\/wp\/v2\/comments?post=236"}],"version-history":[{"count":2,"href":"https:\/\/subian-electric.com\/ru\/wp-json\/wp\/v2\/posts\/236\/revisions"}],"predecessor-version":[{"id":11063,"href":"https:\/\/subian-electric.com\/ru\/wp-json\/wp\/v2\/posts\/236\/revisions\/11063"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/subian-electric.com\/ru\/wp-json\/wp\/v2\/media\/237"}],"wp:attachment":[{"href":"https:\/\/subian-electric.com\/ru\/wp-json\/wp\/v2\/media?parent=236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/subian-electric.com\/ru\/wp-json\/wp\/v2\/categories?post=236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/subian-electric.com\/ru\/wp-json\/wp\/v2\/tags?post=236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}