33kV Main Transformer ODM Project for a Zimbabwe Mine
A 33kV main transformer and supporting shipment package prepared for an ODM mining project in Zimbabwe.
LocationZimbabwe
ApplicationMining
Supply ModelODM Supply
Equipment Supplied
33kV Main Transformer
Discuss a Similar Requirement
Project Delivery
Project Overview

A Zimbabwe mining project required a 33kV main transformer supplied under an ODM arrangement. The project focused on a practical equipment configuration and shipment preparation for a remote industrial site.
Project Requirement
The transformer data, accessories and transport conditions were reviewed before production and packing.
Subian Scope
- 33kV transformer data confirmation
- ODM production coordination
- Final inspection and accessory check
- Heavy-equipment loading preparation
Delivery
The transformer and supporting cases were secured for transport and released for project delivery.
Project at a Glance
DestinationZimbabwe
ApplicationMining
Equipment33kV Main Transformer
CooperationODM Supply
Send Project Details
Project Inquiry
Planning a Transformer or Substation Project?
Send the voltage class, capacity, application and delivery destination. Our team will review the requirement and reply with the next technical steps.